Decks, docks and pool decks, built T-Rex tough Free quotes: start here

Decks · Docks · Pool decks

Decks and docks, built T-Rex tough.

Trex-Decks builds new decks, resurfaces tired ones, wraps pools in barefoot-friendly boards, and builds and repairs private docks. Low-maintenance materials, corrosion-resistant hardware, and a written quote before any work starts.

  • Deck resurfacing
  • Pool decking
  • Dock repairs
  • New decks and piers
Tiny arms. Serious decks.
Composite deck with black aluminum railing and wide steps behind a waterfront home, with a private pier in the distance
Trex-Decks T-Rex mascot in a hard hat holding a cordless drill and a deck board

Why the details matter

Built for sun, water and hard weather

Outdoor structures live a hard life, and harder still near salt water. These four numbers shape almost every decision we make on a job.

300 ft

Where stainless takes over

Within 300 feet of a salt water shoreline, the American Wood Council's deck guide calls for stainless steel fasteners and connectors (DCA 6).

16 in

Joist spacing for composite boards

Trex says joists should generally be no more than 16 inches on center for composite decking, and 12 inches for diagonal layouts (Trex Academy).

316

The stainless grade for salt air

FEMA's coastal guidance says Type 316 stainless is more corrosion resistant than 304, and that fasteners must match their connectors (Technical Bulletin 8).

30 in

Height where guards are required

Decks more than 30 inches above grade need a guard under the model residential code, per the American Wood Council's DCA 6 guide.

Deck being resurfaced: weathered gray boards, exposed pressure-treated joists with joist tape, and new brown composite boards
Resurfacing in progress: old boards off, joists checked and taped, new boards down.

The most common question

Resurface it, or start over?

Deck boards take the weather so the frame does not have to. That is why plenty of tired-looking decks have years of life left in the structure underneath. Resurfacing only makes sense when that structure passes inspection, so we start there.

  • Posts, beams and joists are solid when probed, with no soft spots
  • The ledger is flashed and bolted to the house, not just nailed
  • Hangers and hardware show no red rust
  • Joists are close enough together for the new boards, or can be added to

How a job goes

Four steps, no surprises

Every project is different, but the path from first message to final walkthrough stays the same.

  1. Tell us what you have in mind

    Two minutes on the quote form: what it is, roughly how big, and how to reach you.

  2. We visit and measure

    We look at the site, check any existing structure, and talk through layout, materials and budget.

  3. You get a written quote

    Scope, materials and price on paper. If permits are needed, we map out which ones before work starts.

  4. We build, then walk it with you

    The job is not done until you have walked every board, tried the gate and checked the railing with us.

Materials

Pick the board. We will sweat the parts you cannot see.

Color and grain are the fun part. The parts that decide how long a deck or dock lasts are mostly hidden: the framing lumber, the flashing behind the ledger, and every screw, bolt and hanger holding it together.

Our materials page compares composite, PVC and pressure-treated decking side by side, then covers framing, fasteners, railings and the marine lumber that docks call for.

Composite decking samples in five colors beside a pressure-treated board, a white PVC trim board, stainless screws, hidden fastener clips and a tape measure
Decking samples, stainless screws and hidden-fastener clips.
Do you only install Trex-brand decking?

No. The name comes from the dinosaur, not the manufacturer. We install composite decking from the major brands along with PVC and pressure-treated wood, and we will talk through what suits your deck, your budget and how much sun the boards will see. Trex-Decks is an independent contractor and is not affiliated with Trex Company, Inc.

Can you put new boards on my existing deck frame?

Often, yes. If the posts, beams, joists and the connection to the house are sound, resurfacing swaps the worn boards and rails for new ones and keeps the structure. The frame has to be checked first, and joists sometimes need to be added so the spacing suits composite boards. Our resurface-or-replace guide walks through the checks.

Do I need a permit for a deck or a dock?

Usually. The model residential code exempts only small, low, freestanding decks, and a dock in navigable water needs federal authorization on top of any state and local approvals. See the deck permit guide and the dock permit guide. Rules differ from place to place, so we confirm with your local offices before work starts.

How do I get a price?

Fill in the free quote form. It takes about two minutes. We follow up to arrange a visit, measure the site, and send a written quote that spells out materials and scope.

Quick answers

Asked before every job

These four come up on nearly every first call. The FAQ page covers quotes, decks, resurfacing, pool decks, docks and care in more depth.

Read the full FAQ

Got a deck or dock in mind?

Tell the T-Rex what you are planning. We will come out, measure, and send a written quote.

Get a free quote