Our process

From first message to final walkthrough

Six steps, in order, with nothing started until the one before it is settled. Here is what happens at each stage and what we need from you.

  1. You tell us about the project

    Use the quote form. Project type, rough size, any material preference and your contact details are enough to start. Photos help if you have them to hand when we call.

  2. Site visit and measure

    We measure, look at access, check grade and drainage, and inspect any existing structure. For docks we note water depth, bottom conditions, the shoreline and what the neighbors have built.

  3. Design and material choices

    We talk through layout, board type and color, railing, stairs and extras, and where the budget is best spent. You see real samples, not just a brochure.

  4. Written quote

    You receive a written quote that lists the scope, the materials and the price. If something could change the price, such as hidden rot in an old frame, the quote says how that will be handled.

  5. Permits and scheduling

    Decks and waterfront structures generally need permits, and docks usually answer to federal, state and local offices. We prepare drawings and paperwork and schedule the build around approvals and material lead times.

  6. Build and walkthrough

    We build, clean up, and walk the finished job with you. You get care instructions for the materials used and the manufacturer's warranty information for your records.

Permits

What usually needs a permit

For decks, the model residential code exempts only decks that are no more than 200 square feet, no more than 30 inches above grade at any point, not attached to the house, and not serving the required exit door (IRC R105.2). Most attached and raised decks fall outside that, and cities and counties often set stricter rules of their own.

Docks add more layers. The U.S. Army Corps of Engineers requires authorization for any structure in or over navigable water, "from the smallest floating dock to the largest commercial undertaking" (USACE), and state and local approvals usually apply as well.

Do you need a permit for a deck?
Dock and pier permits

What we need from you

  • A copy of your property survey, if you have one
  • HOA or neighborhood guidelines that cover decks, docks or fences
  • Any known easements, septic fields or buried utilities
  • For docks: the type and size of boat you keep or plan to keep
  • A decision-maker available for the site visit

Timing

How long does it take?

It depends on size, permits, weather and material lead times, so we give you a schedule with your quote instead of a promise on a web page.

As a yardstick, Trex's own resurfacing walkthrough estimates three to five days for two people with intermediate carpentry skills on its example deck (Trex Academy). New builds add footings, framing and inspections. Dock work adds tide windows and the state application.

Three things that slow a job down

  • Hidden damage. Rot under old boards or behind a ledger only shows once things come apart.
  • Approvals. Permit reviews and HOA sign-offs run on their own clocks.
  • Weather and tide. Concrete, stain and piling work all have conditions they will not tolerate.